The following structures were restored during the SeaScapes project:
Red Acre steps at Seaham Marina in 2022 and opened in 2023
[Insert photo]
The Hartlepool High Light in 2023 – ready for the Tall Ships Race in July 2023
The Wave Basin Battery in July 2024
The Wave Basin Battery in Sunderland docks – the interpretation sign is located opposite the battery as the battery is part of Sunderland docks and is not publicly accessible.
These allowed these historical sites to remain intact, and to be enjoyed by the local community and visitors alike.